Designed to supply dispatchable peak power and optimise grid utilisation, the project will evacuate power through the existing KSPDCL Pooling…
Recent Posts
Designed to supply dispatchable peak power and optimise grid utilisation, the project will evacuate power through the existing KSPDCL Pooling…
Recent Posts