Dilip Buildcon-HCC Joint Venture has been declared as L-1 bidder for a new EPC Project. In a filing to BSE, Dilip Buildcon informed that the Company through JV, ie, Dilip Buildcon-HCC (JV) has been declared as L-1 bidder for the tender floated by the National Highways Authority of India. The bid project cost of the project is ₹ 1,900.08 crore.
As per the filing, the company will execute 'Construction of New Link NH-133B from Km 0.200 (Km 200.700 of Sahibganj Bypass) in Jharkhand to Km 15.885 (Km 25.240 of NH-131A) including Ganga Bridge and Construction of Manihari Bypass from Km 0.000 (Km 25.240 of NH-131A) to Km 5.500 (Km 34.100 of NH-131A near Narenpur) and widening of NH-131A from Km 5.500 (Km 34.100 of NH-131A) to Km 6.000 (Km 34.600 of Nh-131A) in the state of Bihar to 4 lane Standards on EPC Mode Project.'
The completion period of the project is 48 months.
Follow