APL Apollo
IIF EPC World Awards
Prime Minister Narendra Modi lays foundation stone for Patratu Super Thermal Power Project

Prime Minister Narendra Modi lays foundation stone for Patratu Super Thermal Power Project

Prime Minister Narendra Modi has laid the foundation stone for the 2400 MW first phase of NTPC's Patratu Super Thermal Power Project in Jharkhand. The project is a 74:26 Joint Venture between Government of Jharkhand (GoJ) and Patratu Vidyut Utpadan Nigam Ltd. (PVUN), a subsidiary company of NTPC establishing a total capacity expansion of 4,000MW.
 
Droupadi Murmu, Governer, Jharkhand; Raghubar Das, Chief Minister, Jharkhand; Ananth Kumar, Minister of Chemicals & Fertilizers and Parliamentary Affairs; R.K. Singh, Union Minister of State (I/C), Power and New & Renewable Energy; Jayant Sinha, Union Minister of State, Civil Aviation; Ashwini Kumar Choubey, Union Minister of State of Health & Family Welfare; Chandra Prakash Choudhary, Minister of Water Resources, Drinking Water & Sanitation, Jharkhand; P.N. Singh, Member of Parliament, Lok Sabha, Dhanbad, Jharkhand; Phul Chand Mandal, Member of Legislative Assembly, Sindri, Jharkhand; Nirmala Devi, Member of Legislative Assembly, Barkagaon, Jharkhand; and eminent dignitaries from the state of Jharkhand and senior officials from Ministry of Power and NTPC were present on the occasion.
 
Envisioning the brighter future for India's 19th State, NTPC’s PVUNL is set to develop the project in two phases: 2,400 MW (3x800MW) in Phase-I and 1,600 MW (2x800 MW) in Phase-II, which will be developed later. This project will allocate 85 per cent of the power to Jharkhand that will benefit the state in the long run and help in the economic growth of the region. Under the Pradhan Mantri Sahaj Bijli Har Ghar Yojana (Saubhagya) scheme, this project will ensure providing 24x7 power availability to the households.
 
The project has salient features of Dry Ash disposable system (second to NTPC Dadri), zero liquid discharge system, Air-cooled condenser technology (only second to North Karanpura STPP) and rail loading facility for transportation of ash. The project further complies with the new emission norms with high efficiency ESP, FGD and Nox emission control systems as well.
 
NTPC is always committed towards an inclusive growth and sustainable development with special focus to improve the quality of life in neighbourhood community. Under the CSR, Community Development scheme, PVUN is already providing clean drinking water, regular health camps and skill development of local youths in the adjoining villages. As the project progresses the community development will further focus on employability, health and sanitation, infrastructure development and the education of girl child.
 
The Engineering, Procurement & Construction contract of the project has been awarded to BHEL. The commissioning of the first unit is envisaged in 2022 and subsequently the other two units after an interval of six months each from the preceding unit.
 
 
@EPC World Media
 
 
 



  • About Us

    EPC World Media Group is a one stop knowledge information hub for Infrastructure, EPC and Construction sector. It strives to promote, propagate and assist the decision and policy makers from government and private organizations along with the technology developers and service providers to enhance and develop their capabilities. EPC World Media facilitates knowledge transfer to grassroots and strengthens their productivity.....

    Read More.....
  • Featured Videos

  • Connect Us